Paul Hoppe wrote:
> Anyone tried it? trackbuildung is horrible...no drag and drop. I think
> its more uncomfortable than in the old TTD.
Gets a while to get used to, but I think I like it. It's certainly better
then building the diagonal tracks in TTD...
I couldn't find a way to change the XXX in "wait for full load of XXX"
option - even if the station has been near the ore mine it still wanted to
wait for coal (coal/ore wagons), the same thing happened with
lumber/paper/steel wagons - the only option for XXX has been lumber.
And the time limit for single game is *much* too short.
Jo'Asia
--
english-signature
>> Stay informed about: Locomotion demo